Environment Plants management Status
Situated within greens of an urban area technically. 1.2km away from this lies the Shingal reservoir and residential areas. 2km away are the Kihung I.C. and Shingal I.C. After going through biological and chemical teratment, water discharge joins the Gongse stream through Singal reservoir and the Osan stream and reaches West sea.
INPUT |
---|
Energy (TJ) : 398 |
Water(kiloton) : 129 |
Recycle Water(kiloton) : 1 |
Toxic chemicals(ton) : 39 |
OUTPUT |
---|
Greenhouse : 20 |
Water discharge(kiloton) : 29 |
Waste Recycling(ton) : 959 |
Waste Landfill(ton) : 3 |
Water pollutants(ppm) | Legal limit | Average |
---|---|---|
Water pollutants(ppm) BOD | Legal limit 20 | Average 2.8 |
Water pollutants(ppm) COD | Legal limit 40 | Average 3.7 |
Water pollutants(ppm) SS | Legal limit 20 | Average 1.1 |
It is located in a general industrial complex in a city and a residential area is formed 0.5km away from the plant. Ui-Wang IC off Ui-Wang to Gwa-Cheon expressway is about 2km away. The entire waste water is disposed on consignment, and household sewage is released into Ui-Wang municipals sewage treatment plant.
INPUT |
---|
Energy (TJ) : 334 |
Water(kiloton) : 102 |
Recycle Water(kiloton) : 0 |
Toxic chemicals(ton) : 0 |
OUTPUT |
---|
Greenhouse : 17 |
Water discharge(kiloton) : 102 |
Waste Recycling(ton) : 1,779 |
Waste Landfill(ton) : 222 |
Air pollutants(ppm, mg/㎥) | Legal limit | Average |
---|---|---|
Air pollutants(ppm, mg/㎥) NOx | Legal limit 200 | Average N/A |
Air pollutants(ppm, mg/㎥) SOx | Legal limit 500 | Average N/A |
Air pollutants(ppm, mg/㎥) Dust | Legal limit 100 | Average 3.0 |
Air pollutants(ppm, mg/㎥) HF | Legal limit 3 | Average N/A |
Air pollutants(ppm, mg/㎥) HCl | Legal limit 6 | Average N/A |
The data calculation period is from January 1st 2014 to December 31st.
It is located at Electronic Material R&D Complex (in Mae-Tan Dong, Yeoung-Tong Gu, Suwon City, Gyeonggi Do, ROK). The center hosts Samsung Group subsidiaries specialized in material businesses such as Samsung Electronics, Samsung Fine Chemicals as well as Samsung SDI, and supports the R&D activities for the development of materials not products or parts. Filthy/waste water is jointly disposed at waste water treatment facility of Samsung Electronics’ Digital City before being released into a nearby river (i.e Won-Cheon River).
INPUT |
---|
Energy (TJ) : 359 |
Water(kiloton) : 54 |
Recycle Water(kiloton) : 0 |
Toxic chemicals(ton) : 0 |
OUTPUT |
---|
Greenhouse : 19 |
Water discharge(kiloton) : 0 |
Waste Recycling(ton) : 326 |
Waste Landfill(ton) : 0 |
The data calculation period is from January 1st 2014 to December 31st.
Situated within the Cheonan industrial complex 3, 200m away from nearest residential areas. 2km away lie the Upsung reservoir and Notae mountain. The plant runs biological and chemical treatments for company sewage. Water discharge moves to the sewerage treatment facility in Area 3 and flows through the Cheonan stream and the Gokgyo stream to the West sea.
INPUT |
---|
Energy (TJ) : 4,390 |
Water(kiloton) : 1,737 |
Recycle Water(kiloton) : 300 |
Toxic chemicals(ton) : 9,627 |
OUTPUT |
---|
Greenhouse : 178 |
Water discharge(kiloton) : 8,093 |
Waste Recycling(ton) : 15,740 |
Waste Landfill(ton) : 422 |
Air pollutants(ppm, mg/㎥) | Legal limit | Average |
---|---|---|
Air pollutants(ppm, mg/㎥) NOx | Legal limit 200 | Average 1.7 |
Air pollutants(ppm, mg/㎥) SOx | Legal limit 500 | Average N/A |
Air pollutants(ppm, mg/㎥) Dust | Legal limit 50 | Average 0.8 |
Air pollutants(ppm, mg/㎥) THC | Legal limit 40 | Average 0.2 |
Water pollutants(ppm) | Legal limit | Average |
---|---|---|
Water pollutants(ppm) BOD | Legal limit 280 | Average 10.2 |
Water pollutants(ppm) COD | Legal limit 320 | Average 12.8 |
Water pollutants(ppm) SS | Legal limit 300 | Average 10.8 |
The data calculation period is from January 1st 2014 to December 31st.
The plant belongs to an industrial complex in an urban area. Within 1 km, there are Mi-Ho river and residential area, and O-Chang IC off Jung-Bu expressway is about 3km away. The waste water disposed from the plant is released into O-Chang Environmental Business Center before being discharged in Mi-Ho river.
INPUT |
---|
Energy (TJ) : 786 |
Water(kiloton) : 956 |
Recycle Water(kiloton) : 469 |
Toxic chemicals(ton) : 2,231 |
OUTPUT |
---|
Greenhouse : 39 |
Water discharge(kiloton) : 487 |
Waste Recycling(ton) : 6,298 |
Waste Landfill(ton) : 13 |
Air pollutants(ppm, mg/㎥) | Legal limit | Average |
---|---|---|
Air pollutants(ppm, mg/㎥) NOx | Legal limit 200 | Average N/A |
Air pollutants(ppm, mg/㎥) SOx | Legal limit 500 | Average N/A |
Air pollutants(ppm, mg/㎥) Dust | Legal limit 100 | Average 6.0 |
Air pollutants(ppm, mg/㎥) HF | Legal limit 3 | Average N/A |
Water pollutants(ppm) | Legal limit | Average |
---|---|---|
Water pollutants(ppm) BOD | Legal limit 100 | Average 25.0 |
Water pollutants(ppm) COD | Legal limit 100 | Average 18.0 |
Water pollutants(ppm) SS | Legal limit 100 | Average 21.0 |
The data calculation period is from January 1st 2014 to December 31st.
Samsung SDI’s Gumi plant belongs to 1st industrial complex of Gumi city. Im-Eun Dong residential area is formed facing the plant’s South Gate, and South Gumi IC and Gumi IC off Gyeongbu Expressway, South Korea’s prime industrial expressway, are only 5 KM away from the plant. The disposed waste water is released into the municipal terminal sewage disposal plant after flowing through Kwang-Pyung River.
INPUT |
---|
Energy (TJ) : 599 |
Water(kiloton) : 509 |
Recycle Water(kiloton) : 110 |
Toxic chemicals(ton) : 1,662 |
OUTPUT |
---|
Greenhouse : 30 |
Water discharge(kiloton) : 465 |
Waste Recycling(ton) : 5,281 |
Waste Landfill(ton) : 12 |
Air pollutants(ppm, mg/㎥) | Legal limit | Average |
---|---|---|
Air pollutants(ppm, mg/㎥) NOx | Legal limit 200 | Average N/A |
Air pollutants(ppm, mg/㎥) SOx | Legal limit 400 | Average 2.6 |
Air pollutants(ppm, mg/㎥) Dust | Legal limit 50 | Average 0.8 |
Air pollutants(ppm, mg/㎥) HF | Legal limit 3 | Average N/A |
Air pollutants(ppm, mg/㎥) HCI | Legal limit 6 | Average 0.6 |
Water pollutants(ppm) | Legal limit | Average |
---|---|---|
Water pollutants(ppm) BOD | Legal limit 80 | Average 0.9 |
Water pollutants(ppm) COD | Legal limit 90 | Average 8.4 |
Water pollutants(ppm) SS | Legal limit 80 | Average 3.9 |
The data calculation period is from January 1st 2014 to December 31st.
Situated within an industrial complex technically. Residential areas are nearby. Mt. Sinbul, called Korea southern Alps, is in the back. After being treated with biological and chemical methods, the final discharge joins the Sangchun stream, the upstream of the Taehwa river, and moves along the river to the East sea.
INPUT |
---|
Energy (TJ) : 4,713 |
Water(kiloton) : 1,604 |
Recycle Water(kiloton) : 346 |
Toxic chemicals(ton) : 7,950 |
OUTPUT |
---|
Greenhouse : 208 |
Water discharge(kiloton) : 1,864 |
Waste Recycling(ton) : 14,727 |
Waste Landfill(ton) : 422 |
Air pollutants(ppm, mg/㎥) | Legal limit | Average |
---|---|---|
Air pollutants(ppm, mg/㎥) NOx | Legal limit 200 | Average 2.0 |
Air pollutants(ppm, mg/㎥) SOx | Legal limit 500 | Average 0.6 |
Air pollutants(ppm, mg/㎥) Dust | Legal limit 100 | Average 3.6 |
Air pollutants(ppm, mg/㎥) HF | Legal limit 3 | Average 0.2 |
Air pollutants(ppm, mg/㎥) HCI | Legal limit 6 | Average 0.4 |
Water pollutants(ppm) | Legal limit | Average |
---|---|---|
Water pollutants(ppm) BOD | Legal limit 10 | Average 0.9 |
Water pollutants(ppm) COD | Legal limit 40 | Average 4.6 |
Water pollutants(ppm) SS | Legal limit 10 | Average 0.7 |
The data calculation period is from January 1st 2014 to December 31st.
Technically situated within the TEDA industrial development area. It is 1.5km away from nearest residential areas. The Won stream runs 4km from the site. The plant runs chemical treatments for company sewage. Water discharge moves to the sewerage treatment facility in Ilsun industrial complex.
INPUT |
---|
Energy (TJ) : 1.455 |
Water(kiloton) : 645 |
Recycle Water(kiloton) : 0 |
Toxic chemicals(ton) : 37 |
OUTPUT |
---|
Greenhouse : 148 |
Water discharge(kiloton) : 224 |
Waste Recycling(ton) : 2,474 |
Waste Landfill(ton) : 0 |
Air pollutants(ppm, mg/㎥) | Legal limit | Average |
---|---|---|
Air pollutants(ppm, mg/㎥) Dust | Legal limit 10 | Average 1.2 |
Air pollutants(ppm, mg/㎥) Foul smell | Legal limit 1,000 | Average 219.5 |
Air pollutants(ppm, mg/㎥) HCI | Legal limit 22 | Average 1.7 |
Water pollutants(ppm) | Legal limit | Average |
---|---|---|
Water pollutants(ppm) BOD | Legal limit 300 | Average 38.6 |
Water pollutants(ppm) COD | Legal limit 150 | Average 36.8 |
Water pollutants(ppm) SS | Legal limit 140 | Average 12.0 |
The data calculation period is from January 1st 2014 to December 31st.
Situated in industrial areas 3km away from nearest residential area. Mt. Angsi is 2km to the east and River Simin runs to the west of the plnat.
INPUT |
---|
Energy (TJ) : 1,702 |
Water(kiloton) : 836 |
Recycle Water(kiloton) : 0 |
Toxic chemicals(ton) : 123 |
OUTPUT |
---|
Greenhouse : 85 |
Water discharge(kiloton) : 201 |
Waste Recycling(ton) : 731 |
Waste Landfill(ton) : 106 |
Air pollutants(ppm, mg/㎥) | Legal limit | Average |
---|---|---|
Air pollutants(ppm, mg/㎥) NOx | Legal limit 2 | Average 0.02 |
Air pollutants(ppm, mg/㎥) SOx | Legal limit 0.2 | Average N/A |
Air pollutants(ppm, mg/㎥) Dust | Legal limit 0.4 | Average 0.01 |
Water pollutants(ppm) | Legal limit | Average |
---|---|---|
Water pollutants(ppm) BOD | Legal limit 50 | Average 33 |
Water pollutants(ppm) COD | Legal limit 200 | Average 142 |
The data calculation period is from January 1st 2014 to December 31st.
SDIV located in Yen Phong 1 industrial zone. The east, west, north, of SDIV is SEV company(0.3km away) and empty land. The south is field, highway far away 0.5km. SDIV have only sewage water(no industrial waste water). Sewage water is treated preliminary by septic tank. After that, it flows into and treated by the waste water system of Samsung Electronics Vietnam.
INPUT |
---|
Energy (TJ) : 116 |
Water(kiloton) : 33,641 |
Recycle Water(kiloton) : 0 |
Toxic chemicals(ton) : 0 |
OUTPUT |
---|
Greenhouse : 5,399 |
Water discharge(kiloton) : 26,913 |
Waste Recycling(ton) : 223 |
Waste Landfill(ton) : 351 |
Air pollutants(ppm, mg/㎥) | Legal limit | Average |
---|---|---|
Air pollutants(ppm, mg/㎥) NOx | Legal limit 850 | Average 0.22 |
Air pollutants(ppm, mg/㎥) SOx | Legal limit 500 | Average 0.2 |
Air pollutants(ppm, mg/㎥) Dust | Legal limit 200 | Average 0.1 |
Air pollutants(ppm, mg/㎥) CO | Legal limit 1,000 | Average 2.0 |
The data calculation period is from January 1st 2014 to December 31st.